PACKAGE PLANNING

Thrill ride solutions, planned around your site

Buying one ride is straightforward. Planning a thrill zone — the right mix of rides, the queue routes between them, the power supply, the fencing, the phasing — is where parks lose money. These four packages are how we structure that work.

  • Equipment selection matched to plot size, attendance and budget band
  • Combined layout drawings showing ride envelopes, queue routes and walkways
  • One shipping plan and one installation schedule for the whole package
  • Phased delivery so you can open in stages rather than all at once

Four packages

Theme Park Thrill Zone

A premium zone built around a flagship ride — pendulum ride or looping coaster — supported by a ship, a swing ride and a tower, with queue routes and night-time lighting designed as one experience.

Read more

Family Entertainment Center

Indoor and covered-outdoor layouts using compact rides: 16-seat ship, 13 m tower, 24-seat flying chair and a wacky worm coaster, specified for ceiling height, floor loading and acoustic limits.

Read more

Carnival & Traveling Shows

Rides specified for repeated dismantling and transport — sectional structures, quick-connect wiring and a documented packing and erection sequence for each unit.

Read more

Scenic Area & Resort

Rides that work in a landscape: 24–36 seat ships, flying chairs, wave swingers and observation wheels, positioned for photography, sightlines and seasonal operation.

Read more

How a package is put together

  1. 01

    Site and demand review

    Plot plan, soil information, power supply, access roads, target attendance and your opening date. We also ask what you already operate, so new rides do not cannibalise the ones you have.

  2. 02

    Ride mix and layout

    We propose two or three combinations with different capital outlays, each with a layout drawing showing envelopes, queue lengths and walkway widths.

  3. 03

    Civil and electrical pack

    Foundation drawings, load cases, drainage notes, power schedule and control room requirements issued as one document for your contractor.

  4. 04

    Fabrication and staging

    Rides are built in sequence so the ones you need first ship first. This is how a package can be opened in two or three phases.

  5. 05

    Shipping and installation

    One consolidated shipping plan, one installation team, one commissioning schedule, one handover pack.

  6. 06

    Operating ramp-up

    Operator training, daily inspection routines, spare parts holding stock and a first-year maintenance calendar.

Which package fits your venue

Venue typeTypical plotRecommended mixTypical capital band
Small FEC / mall400–1,500 m² indoor16-seat ship, 13 m tower, 24-seat flying chairEntry level
Family park5,000–20,000 m²24-seat ship, 36-seat flying chair, wacky worm coaster, medium pendulumMid range
Regional theme park20,000 m²+42-seat pendulum, 36-seat ship, 730 m coaster, 56-seat wave swingerProject scale
Traveling carnivalMobileTransport-configuration ship, windmill, flying chairMid range
Resort / scenic areaVariable24–36-seat ship, flying chair, wave swinger, observation wheelMid to high

What a Dinis package quotation contains

  • Recommended ride mix with the reasoning written out — why each ride, and why not the alternatives
  • Combined site layout at scale, with ride envelopes, queue routes, walkways and service access
  • Foundation drawings and load cases for every ride in the package
  • Electrical schedule with installed load per ride and a recommended incoming supply
  • Itemised price per ride plus a consolidated logistics and installation line
  • Delivery schedule with fabrication milestones and a shipping window
  • Phasing option, showing what could be deferred to a second season

Send your plot plan

A site plan, your target attendance and your opening date are enough for us to come back with a ride mix and an outline layout at no cost.

  • Reply within one working day
  • Layout sketch and model recommendation included
  • No obligation, no sales calls

Fields marked * are required. We use your details only to answer this enquiry — see our privacy policy.

Frequently asked questions

Do you charge for a package layout?

The first layout study is free. Send a plot plan and your target attendance and we will return a ride mix, an outline layout and a budget band at no cost. Detailed layout drawings and civil packs are prepared once you are seriously comparing suppliers and are credited against the order.

Can a package be delivered in phases?

Yes, and it is often the right approach. Many parks buy the flagship ride first, open it, and use the first season's revenue to fund the second phase. We stage fabrication deliberately so the phase-one rides are built and shipped first, and design the foundations so later rides are not compromised.

How far ahead should we plan?

For a single flat ride, three to six months from deposit to opening is realistic. For a package with a coaster, plan 12–24 months. Starting the site survey and power assessment early costs nothing and prevents expensive changes later.

Do you work with our local contractor?

Yes. We supply drawings and load cases; your contractor does the civil and structural work. For installation we send our own engineers to supervise and commission. This keeps local cost and liability where it belongs and still guarantees the ride is installed to specification.