Manufacturer-direct large thrill rides · Zhengzhou, China +86 182 0399 3035 [email protected]
MOBILE PACKAGE

Carnival and traveling show rides

A ride that lives on a trailer for ten years is a different engineering proposition from one bolted to a concrete pad. If you move weekly, the transport configuration has to be designed in at order — not improvised on site.

What changes in a transport specification

Sectional structure

Main frames split into units that fit standard trailer and container dimensions, with alignment dowels and match-marked joints so reassembly is repeatable.

Quick-connect services

Plug-and-socket looms, colour-coded hydraulic or pneumatic lines and pre-set control panels that need no reconfiguration at each site.

Reduced foundation demand

Ballast and spreader-plate arrangements replace cast concrete where the site does not allow excavation, designed so stability calculations stay valid on soft ground.

Documented packing plan

Every ride ships with a loading sequence and a photographic packing record, so the crew that unpacks it is the crew that can repack it.

Reinforced transport frames

Dedicated transport cradles protect the structure during road travel and act as assembly jigs on site.

Rides suited to a traveling operation

RideTransport configurationTypical rig time
24-seat pirate ship2–3 trailer loads, sectional station1–2 days
Speed windmillSectional rotor, folding arm assembly2–3 days
24–36-seat flying chairSectional column and canopy1–2 days
Mini pendulum3–4 trailer loads2–3 days

Specify a ride that travels

Tell us how often you move and what transport you run. We will specify the structure, ballast and rigging sequence around your crew and your trailers.

  • Reply within one working day
  • Layout sketch and model recommendation included
  • No obligation, no sales calls

Fields marked * are required. We use your details only to answer this enquiry — see our privacy policy.

Frequently asked questions

Can any Dinis ride be supplied in a transport configuration?

Most flat rides can: pirate ships, flying chairs, wave swingers, windmills, mini pendulums and drop towers up to 23 m. Coasters are not normally transported because track alignment and foundation design are specific to a fixed site.

How much extra does the transport specification cost?

It depends on the ride. Expect an uplift over the standard price for the sectional structure, quick-connect looms, transport cradles and documentation. We quote it as a separate line so you can see exactly what the mobility costs.

How long does rigging take on site?

One to three days for the rides listed, with a crew of four and a suitable crane or telehandler. Plumb, level and anchor checks are documented at each assembly — a repeatable rigging routine is what keeps mobile rides safe.

Do the safety documents travel with the ride?

Yes. Each transport-configured unit leaves with a rigging manual, stability calculations for the ballast configuration, a load-and-level checklist, and a maintenance schedule. The paperwork is part of the package, not an add-on.

Call WhatsApp Get a quote